AMKA Engineering / Electrical inspection & condition monitoring
Which electrical question needs an answer?
Trips or voltage problems? Transformer condition, earthing or protection? An existing finding that needs action? Start with the question and the decision the evidence must support.
For industrial and commercial switchboards, MV switchgear, transformers and their connections. Findings are rated in writing, with evidence limits and the next step stated.
Choose the question before the method
- Condition
- Heat + discharge → EHA
- Supply / transformer
- Power quality / oil / DGA
- Safety path
- Earthing / protection
- Existing finding
- Review / action / verification
01 / The wider routes
Which electrical question are you trying to settle?
These routes are not automatic additions to an EHA. They are scoped when the site need, an existing finding or the required decision justifies them.
- Condition while running Thermography and partial discharge screening. Thermography reads heat around current-carrying connections; TEV and airborne ultrasound screen for insulation-discharge activity inside closed switchgear. The EHA route combines both while equipment remains in service.
- Supply and transformer Power quality, oil sampling and dissolved-gas analysis. Use when trips, harmonics, voltage behaviour or transformer condition needs evidence beyond the initial screen.
- Earthing and protection Earthing, lightning protection and protection-relay routes. Use when the integrity of the safety path, trip behaviour or protection performance affects the decision.
- Action and closure Corrective work and verification. Act on a supported finding, then re-check the affected electrical points before monitoring or closure.
What this is not. We are a diagnostic and inspection practice, not an electrical contractor. This route does not cover residential wiring, general M&E construction or installation, routine electrician call-outs, continuous online monitoring, or a full mechanical condition-monitoring programme. Where a finding needs corrective work, we say so and name who should do it.
03 / Before approval
The quotation makes the working boundary visible.
- Assets and access
- The equipment, quantities, operating condition, access assumptions and outage requirements are stated.
- Delivery responsibility
- AMKA’s direct role and any confirmed specialist role are identified before commitment.
- Outputs and exclusions
- The readings, report depth, verification requirement and work outside the price are written into the scope.
- Location and timing
- AMKA is based in the Klang Valley and serves clients across Malaysia. Site location, mobilisation and timing are accounted for in the proposal.