Thermography
Resistance heating, imbalance and overload while current is flowing.
AMKA Engineering / Electrical Health Assessment
Heat at the connections and discharge through the insulation can develop inside a closed panel. An Electrical Health Assessment finds both and turns every reading into a rated, written next step.
Free proposal & quotation · Based in the Klang Valley · Serving clients across Malaysia
Already scoped? Attach your asset list or BQ in the proposal form.
02 / What the instruments catch
One surfaced as heat at a connection. The other surfaced as sound from the insulation. That is why the assessment uses both methods rather than asking either one to cover the other’s blind spot.
Connection fault · Danger class
One compressor-isolator terminal reached 65.8 °C — 18.7 °C above the comparison point. The report traced the anomaly to the visibly deteriorated connection.
Insulation fault · Closed panel
TEV and ultrasound can register discharge activity while the board remains closed and running. Carbon tracking is what that deterioration can look like once the panel is opened.
04 / One-off, or programme
A one-off survey establishes a baseline. Repeat surveys of the same points, using comparable methods and operating conditions, can help assess changes over time.
Every panel, joint and termination is mapped live, rated and registered. This can stand alone as a one-off survey.
The same points are read again. Change becomes visible and completed fixes can be checked against the baseline.
Comparable readings can help identify changes and inform maintenance priorities and budgets. They do not, by themselves, establish when an asset will fail.
Selected past clients
Thermography and partial discharge surveys delivered across industrial and port environments, including Panasonic, Westports and GDC Putrajaya.



05 / After a finding
Every finding is tied to the asset, rated and translated into a proportionate next move. The report does not turn every anomaly into a larger job.
Asset, location, instrument reading, visual context and severity are recorded together.
Monitor, plan a repair, verify during an outage or deepen the test — according to the finding.
If switching, isolation, deeper testing or corrective work is needed, the responsible party and separate scope are named first.
When a finding points beyond the assessment: See the wider electrical routes →
06 / Before you approve the scope
The proposal removes the unknowns that usually hold an electrical survey up. You know what will happen, what will arrive and what is outside the price before work begins.
07 / What to send
A complete specification is not required. Any one of these is enough for AMKA to begin shaping the free proposal or quotation.
Attach the existing schedule or bill of quantities in the proposal form. We will work from the asset names, quantities and stated requirements.
A previous report, trip history, maintenance record, reading or photograph helps us identify the right starting depth.
Name the asset, location, urgency and the decision the output must support. We will identify what else is needed.